Stages of building a house from a wooden log house
This is followed by the organization of the frame with a massive roof, the installation of windows, doors and the final sheathing of the entire frame, and after insulation in the house can already be settled.
The whole house can be completed in one summer, although the speed of work can depend on weather or financial points. There are times when the foundation gives a shrinkage in a few years.
In a ruble house, the foundation is twice as massive, concrete is reported to grab about three weeks, after which a holistic structure is assembled, which should be shrinking within a year.