What to take into account when preparing a mixture for an anhydrid screed
The prepared mixture is poured continuously to the required level. Then, using a special metal rod, the mixture is distributed .
At one pass, try to create a layer of maximum required thickness. After pouring, the repires are removed, the floor is finally leveling the floor and air removal.
Within 2 days after pouring, the floor must be protected from sunlight, drafts, moisturizations.
So the anhydrid floor of the floor is quite simple and convenient in execution compared to traditional types of screed. And modern materials allow you to accelerate this process. It is very important when planning the start of work to study the compatibility of the mixture and reason, as well as know how to make a floor screed correctly.